Status Report

Greenway
Ford and sidewalk area below dam have no overflow.

Greenwayat Bridge Construction Area
Still officially closed with a detor.
However, trail under the bridge has been  scraped and is a straight ride through.
Down tree has been removed.

Trail


No new problems just watch for new ruts and loose sand.
Share:

No comments:

Post a Comment

Popular Posts